Overview

NTS own and operate a large gas transmission system in southern Brazil.

NTS asked us for support to develop a reactivation plan for a section of pipeline which had been isolated due to integrity concerns.

The project goal was to consider all available data, review the credible threats and support the operator to develop a strategy (consider 3rd party assessment results) to return the pipeline section to the original MAOP.

Location

Southern Brazil

Project Stats

Length of Isolated Segment

1 km

Diameter

1 inch

Number of joints excavated along system to date

0

The Approach

We collected data from 4 key areas:

A review of all credible threats within the section (including axial and circumferential cracking) was completed which enabled the operator to develop a strategy to return the segment to service.

Results

After a thorough analysis and considering risk, a 5 stage reactivation plan (considering other 3rd party engineering assessment results) was developed to return the pipeline to the original MAOP.

After a few projects with Frontline Integrity, it was clear that they were the right partner to work with. Always eager to understand our issues, and delivering high quality deliverables, Frontline Integrity was a great choice to help us to manage the integrity of our assets, especially in disciplines such as defect assessment, SCC management and overall pipeline integrity management
Pedro Gea